Wesco Asset Management · Coravel

Coravel BMS Command Center

Centralized alarm intelligence across all Coravel data centers.

Every figure below is calculated live from the alarms and CMMS work orders that match the current filters — change the site, severity or date range and the whole module recalculates.

7 BMS feeds connected · CMMS API healthy

1. BMS Alarm2. WAM Alert3. Deduplication4. Work Order in CMMS5. Status Synced to WAM6. KPI / ROI Reporting

Alarms in Range

88

17 still open · 30 Days

Open Alarm Center →

Distinct WAM alerts (after deduplication) detected inside the selected date range and matching the current filters.

Critical Alarms

14

Avg response 24m

View critical alarms →

Priority 1 alerts with life-safety, uptime or environmental risk, inside the current filter selection.

Duplicates Suppressed

404

7 alerts flagged deduplicated

View deduplicated →

Repeat BMS events collapsed into existing alerts by dedup rules across the filtered alarm set.

Work Orders Created

48

41 completed · 30 Days

Open Work Orders →

Work orders raised in Coravel CMMS from WAM alerts inside the selected range.

Open Work Orders

6

3 in progress

View in progress →

Work orders in Created or In Progress state in Coravel CMMS, not yet completed.

Mean Time to Repair

1h 20m

Target 2h 00m · 47 work orders

Open ROI & Reliability →

Average wall-clock time from work order creation to completion for the filtered work orders. Shown in hours and minutes against the 2-hour contract target.

Total Labour Hours

82.5

Across 48 work orders in 30 Days

Open Work Orders →

Sum of technician labour hours logged against every work order generated from a WAM alert in the current selection.

Total Labour Cost

€5,528

Current rate €67/hr · historic rates preserved

Configure hourly rate →

Labour hours multiplied by the hourly rate that was in force when each work order was logged. New rates apply to future hours only.

Avg Cost per Work Order

€115

Avg 1.7 hrs per work order

Open Work Orders →

Total labour cost divided by the number of work orders raised from alerts — the average cost of resolving one alarm.

Cost by Category

Work order labour cost attributed to each alarm category · 30 Days · click to drill into Work Orders

CategoryWOsHoursCostAvg / WO% of total
Gas Plant719.0€1,273€18223%
HVAC1217.3€1,156€9621%
Electrical1115.8€1,055€9619%
Fire Safety59.5€637€12712%
Cooling48.3€553€13810%
Chillers46.0€402€1017%
Doors34.3€285€955%
Security22.5€168€843%
Total4882.5€5,528€115100%

Alarm Volume by Site

30 Days · click a bar to filter the Alarm Center by site

Alarms by Category

30 Days · click a slice or legend row to filter by category

Work Orders Created

30 Days · click a period to drill into Work Orders

Current Risk Panel

Open alarms with the highest severity and duplicate pressure in this selection

Reliability Snapshot

Calculated across 30 Days

Mean Time to RepairAverage wall-clock repair time for work orders in the current selection, shown in hours and minutes.

1h 20m

Target 2h 00m

Mean Time Between FailuresAsset operating hours in the range divided by the number of alarms raised — higher is better.

6 hrs

Per monitored asset

Prevented DispatchShare of alerts resolved remotely or suppressed as duplicates, avoiding a technician dispatch.

45%

Closed without a work order

Avg ResponseAverage minutes between BMS detection and operator acknowledgement in the current selection.

24m

Detection to acknowledgement

Estimated SavingsModelled savings from avoided dispatches, faster resolution, suppressed duplicates and SLA avoidance in this range.

€50,118

30 Days · modelled

Duplicates SuppressedRaw BMS events collapsed by WAM dedup rules, never surfaced to an operator.

404

404 estate-wide